The operating environment of power cables includes a variety of complex occasions, including direct burial, pipe penetration and cable trenches, which are particularly difficult for operation and maintenance personnel to access. Once a power cable breakdown occurs at these locations, the point of failure cannot be quickly identified.


+

The dynamic load management system of transmission line is used to solve the problems such as limited load capacity of transmission line and difficult to meet the demand of load growth, and to improve the operation level and load capacity of the line without changing the existing network structure and without affecting the thermal stability of the line.


+

Affected by natural and man-made factors, the contact resistance of some key wire clamps (strain clamp, wire connection tube, etc.) of transmission lines is too large, and there is a risk of overheating when encountering heavy load, and its temperature may exceed the safety limit. At this time, the wire clamp not only has the risk of burning loss, but also its mechanical strength will decrease, which seriously affects the safety of line operation.


+

The on-line monitoring technology of the dissolved gas composition in the transformer oil can detect the defects or performance deterioration of the equipment as early as possible, provide the judgment basis for the operation and maintenance of the transformer, and improve the reliability of power supply. The traditional on-line chromatographic analysis method is complicated to operate, cumbersome procedures, long monitoring cycle, and high maintenance cost in the later period, which is prone to false alarm or alarm rejection.


+

The transformer state integrated intelligent perception system is designed to realize the real-time perception of the thermal field calculation, dynamic assessment of overload capacity and abnormal insulation state of the transformer, reduce the workload of transformer maintenance, reduce the maintenance cost, and provide guarantee for the reliable operation of the substation. Indoor cabinet Transformer state comprehensive intelligent analysis device Sensors of each monitoring module Outdoor cabinet data management platform ■ Main functions 1) Monitoring of thermal field and load capacity of transformer A. thermal field analysis and calculation: real-time calculation of transformer internal top oil temperature rise, oil average temperature rise, line oil temperature difference, winding average temperature rise, winding hot spot temperature rise, and early warning according to the corresponding information. B. with load capacity assessment: real-time assessment of the transformer under the current operating conditions of the safe operation time, set the load (such as N-1 mode) under the maximum safe operation time, set the time (such as half an hour) under the maximum operating load, draw overload capacity curve. c. Life loss assessment (optional): real-time assessment of transformer life loss based on real-time load, operating temperature and other information. 2) Insulation condition monitoring A. partial discharge monitoring: draw transformer partial discharge phase distribution diagram (PRPD), pulse sequence phase distribution diagram (PRPS), identify the type of partial discharge. B. Vibration and noise monitoring: analyze and extract the characteristic values of vibration signal and noise signal, and effectively identify and alarm abnormal vibration and noise based on multi-variable (energy ratio, complexity, harmonic ratio, etc.) online monitoring data. C. core grounding current monitoring: draw the core grounding current waveform and historical waveform trend chart, set the alarm limit according to the alarm, and timely find the hidden dangers and faults of transformer shell grounding. 3) Comprehensive condition assessment The system cooperates with a variety of state parameter analysis conclusions, and puts forward operation suggestions for the transformer to help the transformer operate economically and safely. ■ Main technical indicators 1) Applicable to oil-immersed transformers with voltage level of 110kV and above; 2) Evaluation time of each module and comprehensive status:<30s.


+

The distribution transformer load intelligent monitoring and anti-burning early warning management system is suitable for the operation monitoring of distribution transformers. Through real-time monitoring of the distribution transformer operating parameters and the ambient temperature, the hot spot temperature of the distribution transformer winding under the current operating conditions is calculated, and the temperature rise classification early warning information is provided to prevent the distribution transformer from burning out and provide guarantee for the safe and reliable operation of the distribution transformer.